***
Updated daily as new information becomes available ***
|
BT-904 UniversityCity
Prosperity Project |
|
Construction Engineering and
Inspection (CEI) Request For Qualifications (RFQ)
______________________________________________________________
|
MCM Design-Build Technical Proposal
|
Legal
Ad Posted December 11th, 2015
|
Request for
Qualifications Package
|
FIU Professional Qualifications
Supplement (PDF)
|
FIU Professional Qualifications
Supplement (Word)
|
RFQ for CEI – Addendum 1 – Posted December 21, 2015
|
RFQ for CEI – Addendum 2 – Posted January 6, 2016
|
CEI Submittals Received
|
Notice of Information 1
|
Notice of Information 2
|
Notice of Information 3
|
CEI Selection
Status Final
|
|
Design-Build (DB) Request
For Proposals (RFP)
______________________________________________________________
|
|
DB
Proposals Received |
DB Notice of
Information No. 1 |
DB Shortlist Status |
DB Pre-Proposals
Meeting PowerPoint Presentation |
DB-Addendum No.1
Issued October 9th, 2014 |
DB-Addendum No.2 Issued
October 23rd, 2014 |
DB-Addendum No.3 Issued
November 6th, 2014 |
DB-Addendum No.4 Issued
May 14th, 2015 |
DB-Addendum No.5 Issued
June 11th, 2015 |
DB-Addendum No. 6 – FINAL - Issued July 8, 2015 |
DB-Addendum No. 7 – FINAL - Issued July 20, 2015 |
DB-Addendum No. 8 – FINAL - Issued July 22, 2015 |
DB-Addendum No. 9 – FINAL-Aug-4-2015 |
DB-Addendum-10 – FINAL-Issued-Sept-17-2015 |
DB-Addendum-11 – FINAL-Issued-Oct-8-2015 |
DB-Agenda for January 22, 2015 Pre-Proposal Meeting |
Design-Build Final Selection Status |
|
FOR REFERENCE ONLY |
a.
DB-Presentations for January 22, 2015 Pre-Proposal Meeting
|
b. City of
Sweetwater TIGER Project and University City Website
|
C. Terminal Access
Concept 1
|
D. SFWMD Letter
|
E. SFWMD Plant List
|
F. SFWMD Petition Waiver
|
G. 14-0536-SPECIFIC (Canal Survey)
|
H.
Soil parameters for Fb-Pier lateral analysis (Nearby Area Soils
Information)
|
|
REQUEST FOR
QUALIFICATIONS/REQUEST FOR PROPOSALS |
a. FIU Design-Build Legal Ad |
b. DBQS Form (.pdf) |
c. DBQS Form (.doc) |
d. UniversityCity Project-Conceptual Plans |
dd.
UniversityCity Project-Conceptual Plans 2015-04 |
ddd. UniversityCity
Project-Conceptual Plans 2015-09 |
e. FIU Pedestrian Bridge Design Criteria |
ee. FIU Pedestrian Bridge Design Criteria 2015-04 |
f. FIU UniversityCity Complete Streets Design Criteria |
ff. FIU UniversityCity Complete Streets Design Criteria 2015-04 |
g. FIU-DB-RFP-Maxprice |
h. FIU-DB-Special Provisions |
i. TigerGrant Design-Build Contract |
j. FIU General Specifications for Design-Build
|
k. Design-Build Price Proposal Form
|
kk. Design-Build_Price_Proposal_Form-Addendum_11
|
l. Design-Build Bidder Checklist
|
m. Project Schedule of
Values Form
|
n. Topographic Survey (compressed drawing files (.zip)) |
o. Geotechnical Reference Documents |
p. NEPA Document |
q. NEPA Re-Evaluation |
qq. NEPA
Re-Evaluation-2 |
r.
UniversityCity Project Conceptual Plans CAD Compressed Drawing Files
(.zip) |
rr. Updated CAD Files
5-2015 (.zip) |
s.
Fernandez-Beraud Landscape-Hardscape CAD (.zip) |
t. NC-Office BTTRMP_siteplan CAD
(.zip) |
TRAFFIC STUDIES |
a. FDOT_Aleman_Traffic_Impact_Closure_SW107 AVE_SW_7_TERR_11-20-2102 |
b._FDOT_TYLIN_Final_FIU-UniversityCity_Traffic_Memo_4-25-2014 |
c._FDOT_URS_TWO#143_SR90_AT_SW_109_AVE_11-13-2013 |
d._FIU_ML_All_Campus_Existing_Traffic_Analysis_2-11-2013 |
e._FIU_ML_PG6_Final_Report_12-12-12 |
f._FIU_ML_Study_Update_All_Campus_6-24-2013 |
g._TYLin Goal Associates Traffic Study 12-2014 |
h._TYLin Goal
Associates Traffic Study 04-2015 |
|
PRELIMINARY UTILITY
COORDINATION INFORMATION |
a. Utility Maps |
b. FPL Letter dated May 9,2014 |
|
INSURANCE REQUIREMENTS |
a.
Architect/Engineer |
b. Construction Management Major Projects |
c. Payment & Performance Bonds |
|
FIU BUILDING STANDARDS |
a.
FIU Building Standards |
b.
FIU Hardware Standards |
c.
FIU Division 25 Standard |
d. FIU Information Communication Resource Requirements |
|
PERMIT INFORMATION |
a. Building Permit Application Form |
b. BCA
Comprehensive List |
c. Inspection Procedures & Requirements |
d. Building Permit Requirements for Modular Buildings |
e. Required Shop Drawings and Products Approvals |
f. A/E
Affidavit Form |
g.
A/E Closing Affidavit Form |
h. Special Inspector Affidavit Form |
i. Special Inspector Closing Affidavit Form |
j. CC or TCO or CO Request Letter |
k. Building Code Administration Program |
|
|
|
|
|
|
|